Portfolio Overview

ทั้งหมด (3) โครงการ

Total
3
Completed
0
In Progress
0
Planned
3
On Hold
0
Other
0
Project Status Breakdown
Completed 0
In Progress 0
Planned 3
On Hold 0
Other 0
Portfolio Health
88%
Overall Score
Passing: 3 Warnings: 0 Other: 0
ใกล้ถึงกำหนด (Top 5)
  • PRJ-2608001 — Wiring Control Valve
    ล่าช้า 6 วัน · 2026-09-05
  • PRJ-2608002 — Install main power for Conveyors panel and plc at TD Bangwua
    อีก 1 วัน · 2026-09-12
  • PRJ-2608003 — MECHANICAL CHUTE WOEK SCHEDULE.
    อีก 2 วัน · 2026-09-13
คืบหน้าสูงสุด
  • PRJ-2608002 — Install main power for Conveyors panel and plc at TD Bangwua
    Progress: 0% · Planned
  • PRJ-2608003 — MECHANICAL CHUTE WOEK SCHEDULE.
    Progress: 0% · Planned
  • PRJ-2608001 — Wiring Control Valve
    Progress: 0% · Planned
Team Breakdown
  • Aswin Pinrat
    1 projects
  • Engineering (IET)
    1 projects
  • Somkit
    1 projects
Planned 0
In Progress 0
On Hold 0
Completed 0
Other 0