Portfolio Overview
ทั้งหมด (3) โครงการ
Total
3
Completed
0
In Progress
0
Planned
3
On Hold
0
Other
0
Project Status Breakdown
Completed 0
In Progress 0
Planned 3
On Hold 0
Other 0
Portfolio Health
88%
Overall Score
ใกล้ถึงกำหนด (Top 5)
-
PRJ-2608001 — Wiring Control Valveล่าช้า 6 วัน · 2026-09-05
-
PRJ-2608002 — Install main power for Conveyors panel and plc at TD Bangwuaอีก 1 วัน · 2026-09-12
-
PRJ-2608003 — MECHANICAL CHUTE WOEK SCHEDULE.อีก 2 วัน · 2026-09-13
คืบหน้าสูงสุด
-
PRJ-2608002 — Install main power for Conveyors panel and plc at TD BangwuaProgress: 0% · Planned
-
PRJ-2608003 — MECHANICAL CHUTE WOEK SCHEDULE.Progress: 0% · Planned
-
PRJ-2608001 — Wiring Control ValveProgress: 0% · Planned
Team Breakdown
-
Aswin Pinrat1 projects
-
Engineering (IET)1 projects
-
Somkit1 projects
Planned
0
In Progress
0
On Hold
0
Completed
0
Other
0
| Project | Code | Team | Status | % | Start | End | Action | |
|---|---|---|---|---|---|---|---|---|
| MECHANICAL CHUTE WOEK SCHEDULE. | PRJ-2608003 | Aswin Pinrat | Planned |
0%
|
2026-08-04 | 2026-09-13 | ||
| Install main power for Conveyors panel and plc at TD Bangwua | PRJ-2608002 | Engineering (IET) | Planned |
0%
|
2026-08-10 | 2026-09-12 | ||
| Wiring Control Valve | PRJ-2608001 | Somkit | Planned |
0%
|
2026-08-28 | 2026-09-05 |
🌤️